The embodiment of modern technology and ecology

eCO TECH H​​OUSES

Technology ahead of its time and changing the idea of ​​comfort.

All of the above elements together provide comfort, health, longevity, and all this is free.

Thermal circuit

Multilayer wall 300 mm made of insulated concrete slabs. Sealed PVC windows.

Warm floor

AHT electric floors made of amorphous shielded tape.

Smart ventilation

Filtration, recovery, ozonation, quartz treatment, humidification.

Air conditioner

Energy efficient zoned split system.

Heat pump

An energy-efficient solution with high efficiency and great potential.

Climate control

CO2, humidity, temperature, pressure sensors.

Solar panels 

Free solar energy.

Batteries

Free solar energy even at night.

Water filters

Clean water is the key to health and longevity

Water decalcifier

Safety of the plumbing system, electric kettles and your blood vessels.

Durable façade

Minimum hassle and expense

Smart House

Comfort that you don’t need to think about, it is supported by electronics. Also monitors safety.

The process of building a house
How does it work?

01

Selecting a site: your own, from a catalog, selection. Expertise (purpose, encumbrance, technical compliance. Conclusion of an agency agreement to search for a site.

02

Choosing a suitable house model. 


03

Conclusion of a contract for design work and a contract for the construction of a house, linking the house to the site.

04

Conclusion of a contract for the supply of house kits in accordance with the specifications.

05

Submission of the architectural project to the administration. Obtaining a building permit. License.

06

Site clearance and geodetic surveys


07

Foundation construction.
Three options: concrete cabinets, slab, ground floor.

08

Installation of the frame. Delivery of frame parts from warehouse to site and assembly.

09

Interfloor ceilings of the 1st floor
Installation of subfloors.

10

Internal perimeter of walls


11

Overlap, roofing


12

Communications. (light/water/air conditioning/ventilation)


13

Windows and doors


14

Pre-installation of equipment and communications
Air conditioning, ventilation, Smart home.

15

Finishing (interior panels)
Installation of skirting boards

16

San.Uzel. Finishing with tiles, installing sanitary equipment.


17

Stretch ceiling. Installation of lighting fixtures.


18

Installation of heated floors.
Laying quartz vinyl laminate

19

Equipment installation and start-up


20

Delivery of the object, registration of documents for the property

.